Our Industries Field & Project Achievement

Material Handling System of CFB Power Plant

Item Client Peoject Name Belt Width Capacity
(Ton / Hr)
Belt Speed
(M / min.)
Material
1
Mai-Liao CFB Power Plant
Material Handling System
BW 900 ~ BW 1200
300 ~ 500
105
Coal
Coke
Ash
2
Sumitomo Heavy Industry
Vitnam Hanoi Power Plant (50MW x 2 units)
BW 650
180
105
Coal
Ash
3
Xianglu Petrochemicals (Xiamen)
Coal feeder, Limestone feeding, and Bottom ash Handling System (100MW x 3 units)
BW 1000
20 ~ 40
1.8 ~ 18
Coal
Limestone
Ash
4
Formosa Plastics Group
Formosa Heavy Industry Ningbo Co-Gen Power Plant (100MW x 2 units)
BW 900 / BW 750
300
80 / 120
Coal
Ash
Sand
Limestone
5
Marubeni Corp. (MC)
Indonesia Tarahan Project (100MW x 2 units)
-
-
-
Coal
Ash
6
Formosa Plastics Group
APEC Co-Gen Power Plant (100MW x 2 units)
BW 750
200
110
Coal
Ash
Sand
Limestone
7
Marubeni Corp. (MC)
BW 1000 / BW 650 / BW 650
1040 / 100 / 50
189 / 60 / 24
Coal
8
PT Rekayasa Industri
Material Handling System (35MW x 2 units)
-
-
-
Coal
Ash
9
Cheng Loong Corp.
BW 800 / BW 500 / BW 300
150 / 20 / 40
70 / 30 / 80
Coal
RDF
Tire
Sludge
10
Ming Rong Yuan Business Co., Ltd.
Material Handling System (Steam capacity 120 ton/hr)
BW 750
100
60
Coal
Ash
1-2 of 2